Part 107

Certificate of Waiver

Received a Part 107 waiver to conduct operations up to 200' AGL or within 200' of an object or obstacle for the purpose of Critical Infrastructure inspections.


American Electric Power


Operations Details:

Locations Covered

Columbus, OH

Flight Parameters

Received a Part 107 waiver to conduct operations up to 200' AGL or within 200' of an object or obstacle for the purpose of Critical Infrastructure inspections.