Challenge
Inspecting the Mike O'Callaghan-Tillman Bridge, spanning the Colorado river on the Nevada and Arizona state border using traditional methods would take two weeks, require lane closures, snooper trucks, and the use of harnesses for workers to climb the bridge.
Skydio Solution
Stantec partnered with Skydio to develop a comprehensive drone-based bridge inspection plan that used 3D scan for assessing the structure from all angles which includes difficult to reach areas around columns, underneath the bridge arch segments, and in the tight spaces around girders.
Results
Inspection time was reduced from ten days to five days on the Mike O'Callaghan-Tillman Bridge, reducing the cost by 50%. In addition, they were able to reduce the need for snooper trucks, reduced usage of harnesses and limited lane closure which led to increased safety.